Project

 
MOODY PARK OUTDOOR POOL
New Westminster, B.C.
 
Moody Park outdoor pool (50 years old), New Westminster, B.C.
Repair spalled concrete with a mortor dosed with Xypex Admix C-1000.
Chip full perimeter of pool at floor and wall joint.
Chip cracks in floor slab also.
Chip out transition joint.
Sand blast joints to remove old products and to create a proper profile for installation of the Xypex Chemical waterproofing system.
Installing the Xypex Concentrate and slurry coat and dry pack of concentrate.
Pneumatically pack Drypack into routed out slot.
Install the Xypex Admix C-1000 fortified mortar in 2 levels at transition joint.
Picture of pool completed.
     
 

Home

 
     
 

Other Project Photos: